Phase two will consist of upgrading the remaining plant models, including containment, emergency core cooling and common services, and migrating the legacy control logic and electrical systems into the Orchid modeling environment through a translator. This approach will enable Koeberg to pre-train their operators on upcoming plant changes scheduled for the plant outage in late 2010. Phase one will include remodeling of the balance of plant (BOP) process loop, simulation of the new Alstom ALSPA CONTROSTEAM steam turbine controller, emulation of the core monitoring system display and provision of an interface to Westinghouse’s ovation DCS. The simulator upgrade project will be rolled out in two phases during which the current simulation will be migrated to a full L-3 MAPPS simulation environment.